0
votes
0
answers
The total float (in days) of activities “e” and “f”, respectively, are
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2014
im&or
pert&cpm
0
votes
0
answers
The normal time the free float on Activity 4-6 and the project duration, respectively, are
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2014
im&or
pert&cpm
0
votes
0
answers
If the project duration has to be crashed down to 9 days, the total cost (in Rupees) of the project is __
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2014
im&or
pert&cpm
0
votes
0
answers
The critical path for the project is
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2012
im&or
pert&cpm
0
votes
0
answers
The project activities, precedence relationships and durations are described in the table.
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2010
im&or
pert&cpm
0
votes
0
answers
The critical path duration of the network (in days) is
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2009
im&or
pert&cpm
0
votes
0
answers
Which of the following equations can be used to find sG?
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2008
im&or
pert&cpm
0
votes
0
answers
The standard deviation of the critical path of the project is
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2006
im&or
pert&cpm
0
votes
0
answers
The number of activities that need to be crashed to reduced the project duration by 1 day is
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2005
im&or
pert&cpm
0
votes
0
answers
The project can be completed
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2003
im&or
pert&cpm
0
votes
0
answers
The distribution of the project duration is
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2002
im&or
pert&cpm
0
votes
0
answers
In the construction of networks, dummy activities are introduced in order to:
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
1990
im&or
pert&cpm
0
votes
0
answers
In PERT chart, the activity time distribution is
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2016
im&or
pert&cpm
0
votes
0
answers
A minimal spanning tree in network flow models involves
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2014
im&or
pert&cpm
0
votes
0
answers
The expected time (te) of a PERT activity in terms of optimistic time (t0), pessimistic (tp) and most likely time (tL)
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2009
im&or
pert&cpm
0
votes
0
answers
In PERT analysis a critical activity has
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2004
im&or
pert&cpm
0
votes
0
answers
A dummy activity is used in PERT network to describe
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
1997
im&or
pert&cpm
0
votes
0
answers
In PERT, the distribution of activity times is assumed to be
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
1995
im&or
pert&cpm
0
votes
0
answers
The profit from a chair is Rs.100 and that from a table is Rs. 300.
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2002
im&or
linear-programming
0
votes
0
answers
Solve the following linear programming problem by simplex method
asked
Sep 6, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2000
im&or
linear-programming
Page:
« prev
1
...
32
33
34
35
36
37
38
39
40
...
102
next »
Ask a question:
Welcome to Q&A discussion forum, where you can ask questions and receive answers from other members of the community.
Categories
All categories
GATE
(2k)
IES Objectives-1
(1.8k)
IES Objectives-2
(2.8k)
IES Conventional-1
(655)
IES Conventional-2
(1.1k)
IAS Mains
(633)
IAS Prelims
(1.2k)
IES GS & Aptitude
(61)
Engineering Mathematics
(1)
Most popular tags
ies-objectives-2
gate
ies-objectives-1
production
iasprelims
ies-conventional-2
im&or
tom
fm
td
som
ies-conventional-1
iasmains
md
ppe
2009
2008
2014
2007
2005
10.4k
questions
274
answers
26
comments
15.3k
users
...