Login
Remember
Register
Adapala's Forum
Home
Questions
Unanswered
Tags
Categories
Users
Ask a Question
Adapala
IES GS
Ask a Question
Recent questions in GATE
0
votes
0
answers
Material Requirements Planning
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2015
im&or
mrp
0
votes
0
answers
In an MRP system, component demand is
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2006
im&or
mrp
0
votes
0
answers
01. For planning the procurement or production of dependent demand items, the technique most suitable is __
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
1995
im&or
mrp
0
votes
0
answers
The minimum total cost (in Rs.) of procurement to the firm is.
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2006
im&or
assignment
0
votes
0
answers
Solution to the balanced assignment problem is binary due to
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2015
im&or
assignment
0
votes
0
answers
The total number of decision variables in the objective function of an assignment problem of size n $\times$n is
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2014
im&or
assignment
0
votes
0
answers
Sequencing - Make span minimization, Johnson's rule
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
1995
im&or
sequencing
makespan
0
votes
0
answers
If no other order is processed simultaneously, what are the percentage utilization of milling and drilling machines?
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
1991
im&or
sequencing
0
votes
0
answers
For the processing sequence R-P-S-T-Q, total tardiness is ___________
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2015
im&or
sequencing
0
votes
0
answers
The optimal make-span (in hours) of the shop is
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2006
im&or
sequencing
0
votes
0
answers
Assume that all orders are ready for processing. Give a production schedule that minimizes the average flow time
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
1998
im&or
scheduling
0
votes
0
answers
Which schedule will minimize the total cost? What is the minimum total cost?
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
1996
im&or
scheduling
0
votes
0
answers
Considering mean lateness and mean flow time, evaluate the shortest-time rule and least-slack rule
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
1990
im&or
scheduling
0
votes
0
answers
The average completion time (in minutes) of jobs as per the Shortest Processing Time rule is
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2016
im&or
scheduling
0
votes
0
answers
If the Earliest Due Date (EDD) rule is used to sequence the jobs, the number of jobs delayed is
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2010
im&or
scheduling
0
votes
0
answers
Average flow time (in days) for the above jobs using shortest Processing time rule is
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2009
im&or
scheduling
0
votes
0
answers
The processing time (in days) is given in the table below. The holding cost for each job is Rs. K per day.
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2008
im&or
scheduling
0
votes
0
answers
At steady state, the line efficiency, in % is _____
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2015
im&or
line-balancing
0
votes
0
answers
What is the line efficiency of the assembly line?
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2006
im&or
line-balancing
0
votes
0
answers
For line balancing the number of work stations required for the activities M, E and T would respectively be
asked
Sep 9, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2004
im&or
line-balancing
Page:
« prev
1
...
27
28
29
30
31
32
33
34
35
...
102
next »
Ask a question:
Welcome to Q&A discussion forum, where you can ask questions and receive answers from other members of the community.
Categories
All categories
GATE
(2k)
production
(409)
IM&OR
(175)
SOM
(145)
TOM
(164)
Engg Mechanics
(75)
Material Science
(53)
fm&turbo
(196)
HT
(152)
TD
(342)
MD
(111)
Engg-aptitude
(214)
IES Objectives-1
(1.8k)
IES Objectives-2
(2.8k)
IES Conventional-1
(655)
IES Conventional-2
(1.1k)
IAS Mains
(633)
IAS Prelims
(1.2k)
IES GS & Aptitude
(61)
Engineering Mathematics
(1)
Most popular tags
ies-objectives-2
gate
ies-objectives-1
production
iasprelims
ies-conventional-2
im&or
tom
fm
td
som
ies-conventional-1
iasmains
md
ppe
2009
2008
2014
2007
2005
Recent questions in GATE
10.4k
questions
274
answers
26
comments
15.3k
users
...