A manufacturing shop processes sheet metal jobs, where in each job must pass through two machines (M1 and M2, in that order).

The processing time(in hours) for these jobs is                                                                                                                       

Machine

Jobs

 

P

Q

R

S

T

U

M1

15

32

8

27

11

16

M2

6

19

13

20

14

7

      The optimal make-span (in hours) of the shop is

      (a) 120                            (b) 115                         (c) 109                            (d)  79