A left Hand – Right Hand activity chart is given below

Left Hand activity

Symbol

Time in Min

Symbol

Right Hand Activity

Lift the work piece

 

0.1

 

 

 

 

0.1

 

Open the vice

Clamp the work piece

 

0.2

 

Clamp the work place

 

 

0.1

 

Take the file

De hand filling

 

1.5

 

De hand filling

 

 

0.1

 

Take the micrometer

Check the dimension

 

0.4

 

Check the dimension

 

 

0.1

 

Open the vice

Remove the work plece

 

0.1

 

 

The cycle time for the operation is

(a) 2.3 min    (b) 2.5 min    (c) 2.7 min     (d) 2.2 min