Match List I (Production Control Function) with List II (Explanation) and select the correct answer using the code given below the Lists:
List I
(a) Bill of Materials (BOM)
(b) Capacity Resource Planning (CRP)
(c) Material Requirement Planning (MRP)
(d) Master Production Schedule (MPS)
List II
1. A technique for determining the quantity and timing of dependent demand items
2. A technique for determining personnel and equipment capacities needed to meet the production objective
3. Specifies what end items are to be produced and when
4. The part numbers & quantity required per assembly
Codes:
A B C D
(a) 4 1 2 3
(b) 3 2 1 4
(c) 4 2 1 3
(d) 3 1 2 4