Match List – I (Methods) with List – II (Problems) and select the correct answer using the codes given below the lists:
List – I
(a) Moving average
(b) Line balancing
(c) Economic batch size
(d) Johnson algorithm
List – II
1. Assembly 2. Purchase
3. Forecasting 4. Sequencing
Codes:
A B C D
(a) 1 3 2 4
(b) 1 3 4 2
(c) 3 1 4 2
(d) 3 1 2 4