0 votes
120 views
asked in production by (215k points)

A conventional lathe and a CNC lathe are under consideration for machining a given part. The relevant data are shown below:

 

Conventional Lathe

CNC Lathe

Preparation Cost (Rs)

               30

         150

Production time per part (min)

               30

         15

Machine and operator cost (Rs)

               75

         120

The machine preferred for producing 100 pieces is

(a) Conventional lathe                   (b) CNC lathe

(c) Any of the above                      (d) None