Match List – I with List – II and select the correct answer using the code given below the lists:
List – I (Technique) List – II (Suitable for)
A. Time study 1. Short – cycle non – repetitive jobs
B. Work sampling 2. Manual operations
C. Analytical estimation 3. Short – cycle repetitive jobs
D. ATM 4. Long – cycle jobs/heterogeneous operations/operations involving team work
A B C D
(a) 2 4 1 3
(b) 3 1 4 2
(c) 2 1 4 3
(d) 3 4 1 2