Match List – I with List – II and select the correct answer using the code given below the lists:
List – I (Contribution) List – II (Contributor)
A. Specialization of labor in manufacturing 1. Henry Gantt
B. Scheduling techniques 2. George Dantzig
C. Linear programming 3. Adam Smith
D. Quality and productivity applications from Japan 4. W.E. Deming
A B C D
(a) 3 4 2 1
(b) 2 1 3 4
(c) 3 1 2 4
(d) 2 4 3 1