Login
Remember
Register
Adapala's Forum
Home
Questions
Unanswered
Tags
Categories
Users
Ask a Question
Adapala
IES GS
No answer
No selected answer
No upvoted answer
Ask a Question
Recent questions without a selected answer
0
votes
0
answers
the reduction in load carrying capacity would be
asked
Jan 7, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2012
som
bending&shearstressdistribution-inbeams
0
votes
0
answers
The ratio of the moments of resistance of a square beam (Z) when
asked
Jan 6, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2012
som
bending&shearstressdistribution-inbeams
0
votes
0
answers
Maximum longitudinal stress in the beam occurs at
asked
Jan 6, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2011
som
bending&shearstressdistribution-inbeams
0
votes
0
answers
Match List I with List II
asked
Jan 6, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2010
som
bending&shearstressdistribution-inbeams
0
votes
0
answers
What is the maximum shear stress developed at the same cross – section due to the same loading?
asked
Jan 6, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2009
som
bending&shearstressdistribution-inbeams
0
votes
0
answers
What is the shape of the shearing stress distribution across a rectangular cross- section beam?
asked
Jan 6, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2008
som
bending&shearstressdistribution-inbeams
0
votes
0
answers
the maximum shear stress developed in the beam is greater than the average shear stress by
asked
Jan 6, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2008
som
bending&shearstressdistribution-inbeams
0
votes
0
answers
the maximum shear stress is developed
asked
Jan 6, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2008
som
bending&shearstressdistribution-inbeams
0
votes
0
answers
When a rectangular section beam is loaded transversely along the length
asked
Jan 6, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2007
som
bending&shearstressdistribution-inbeams
0
votes
0
answers
Which one of the following is true in respect of production control for continuous or assembly line production?
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2002
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
The reason or diversification is to
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2002
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Which one of the following is the preferred logical sequence in the development of a flew product?
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2002
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Match List I(Files in MRP) with List II (Inputs required)
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2002
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Match List I (Wage payment plans) with List II (Method of payment)
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2002
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Dispatching function of Production planning and control is
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Number of welding lines required is
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
In production planning and control the document which authorizes the strat of an operation on the shop floor is the
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
During manufacture of cement the handling of limestone s done by
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Match List – I (OR – technique) with List – II (Model)
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Which one of the following combinations is valid for product layout?
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
scheduling&line-balancing-product-development&mrp
Page:
« prev
1
...
106
107
108
109
110
111
112
113
114
...
520
next »
Ask a question:
Welcome to Q&A discussion forum, where you can ask questions and receive answers from other members of the community.
Categories
All categories
GATE
(2k)
IES Objectives-1
(1.8k)
IES Objectives-2
(2.8k)
IES Conventional-1
(655)
IES Conventional-2
(1.1k)
IAS Mains
(633)
IAS Prelims
(1.2k)
IES GS & Aptitude
(61)
Engineering Mathematics
(1)
Most popular tags
ies-objectives-2
gate
ies-objectives-1
production
iasprelims
ies-conventional-2
im&or
tom
fm
td
som
ies-conventional-1
iasmains
md
ppe
2009
2008
2014
2007
2005
10.4k
questions
274
answers
26
comments
15.3k
users
...