Which one of the following is true in respect of production control for continuous or assembly line production?   

(a) Control is achieved by PERT network

(b) Johnson algorithm is used for     sequencing

(c) Control is on one work centre only

(d) Control is on flow of identical     components through several operations

Please log in or register to answer this question.