A standard machine tool and an automatic machine tool are being compared for the production of a component. Following data refers to the two machines.

 

Standard Machine Tool

Automatic Machine Tool

Set Up time

30 min

2 hours

Machining time per piece

22 mm

5 mm

Machine rate

   Rs.200/Hour

   Rs.800/Hour

The breakeven production batch size, above which the automatic machine tool will be economical to use, will be

(a) 4          (b) 5          (c) 24           (d) 225