0 votes
52 views
asked in power plant by (215k points)
  1. (a)  A power generating station has a maximum demand of 20 MW. The daily load on the station is as follows.

Time

Load, MW

6 AM to 8 AM

8 AM to 12 NOON

12 NOON to 1 PM

1 PM to 5 PM

5 PM to 7 PM

7 PM to 9 PM

9 PM to 11 PM

11 PM to 6 AM

7

16

6

15

17

20

9

4

  1. Draw the load curve and load duration curve for the plant.
  2. Decide the capacity and number of units.
  3. Prepare the operating schedule of the units.

Determine the load factor, plant capacity factor and plant use factor of the station.  

Please log in or register to answer this question.

Welcome to Q&A discussion forum, where you can ask questions and receive answers from other members of the community.

10.4k questions

274 answers

26 comments

15.3k users

...