Login
Remember
Register
Adapala's Forum
Home
Questions
Unanswered
Tags
Categories
Users
Ask a Question
Adapala
IES GS
Ask a Question
Recent questions tagged inventory-control
0
votes
0
answers
In the above figure define the lines L1,L2,L3,andL4 in the ATPlanguage.
asked
Oct 27, 2017
in
IM&OR
by
chandu
(
215k
points)
iasmains
2012
im&or
inventory-control
0
votes
0
answers
What is detailed work factor system of PMT?
asked
Oct 27, 2017
in
IM&OR
by
chandu
(
215k
points)
iasmains
2012
im&or
inventory-control
0
votes
0
answers
What should be the order quantity?
asked
Oct 26, 2017
in
IM&OR
by
chandu
(
215k
points)
iasmains
2011
im&or
inventory-control
0
votes
0
answers
The low break even point is due to which one of the following factors?
asked
Oct 23, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2009
im&or
inventory-control
0
votes
0
answers
Which one of the following is a listing of all activities or responsibilities of every person in a department or group?
asked
Oct 23, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2009
im&or
inventory-control
0
votes
0
answers
Which one of the following is feasible for study of medium and long – cycle operations?
asked
Oct 23, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2009
im&or
inventory-control
0
votes
0
answers
what is the standard time of operation?
asked
Oct 23, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2009
im&or
inventory-control
0
votes
0
answers
Reducing set – up time decreases
asked
Oct 20, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2009
im&or
inventory-control
0
votes
0
answers
The material handling cost of product going through the process.
asked
Oct 20, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2009
im&or
inventory-control
0
votes
0
answers
Why is a floating position of holding fixture in a rotary transfer device used?
asked
Oct 13, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
What is the standard time for the operation?
asked
Oct 13, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
Match List – I with List – II and select the correct answer using the code given below the lists:
asked
Oct 13, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
What is the approximate standard time for this job?
asked
Oct 13, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
Match List – I with List – II and select the correct answer using the code given below the lists:
asked
Oct 13, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
Consider the following steps in a line balancing problem:
asked
Oct 13, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
Consider the following steps in a line balancing problem:
asked
Oct 13, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
Consider the following statements in respect of operations planning:
asked
Oct 13, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
Kilbridge and Wester method is used for which one of the following problems in a manufacturing unit?
asked
Oct 11, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
What is the manufacturing lead time?
asked
Oct 11, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
In a low volume production, the dispatching function is not concerned with issuing of which one of the following?
asked
Oct 9, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2007
im&or
inventory-control
Page:
« prev
1
2
3
4
5
6
7
8
9
10
next »
Ask a question:
Welcome to Q&A discussion forum, where you can ask questions and receive answers from other members of the community.
Categories
All categories
GATE
(2k)
IES Objectives-1
(1.8k)
IES Objectives-2
(2.8k)
IES Conventional-1
(655)
IES Conventional-2
(1.1k)
IAS Mains
(633)
IAS Prelims
(1.2k)
IES GS & Aptitude
(61)
Engineering Mathematics
(1)
Most popular tags
ies-objectives-2
gate
ies-objectives-1
production
iasprelims
ies-conventional-2
im&or
tom
fm
td
som
ies-conventional-1
iasmains
md
ppe
2009
2008
2014
2007
2005
10.4k
questions
274
answers
26
comments
14.7k
users
...