0
votes
0
answers
The variance is four days. The probability that the project will be completed in 36 days is
asked
Dec 30, 2017
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
1997
im&or
pert&cpm
0
votes
0
answers
Generally PERT is preferred over CPM for the
asked
Dec 30, 2017
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
1996
im&or
pert&cpm
0
votes
0
answers
In the network shown below the critical path is along
asked
Dec 30, 2017
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
1996
im&or
pert&cpm
0
votes
0
answers
Which of the following are the guidelines for the construction of a network diagram?
asked
Dec 30, 2017
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
1996
im&or
pert&cpm
0
votes
0
answers
In a CPM, the cost slope is determined by
asked
Dec 30, 2017
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
1994
im&or
pert&cpm
0
votes
0
answers
For the PERT network shown in the given figure the probability of completing the project in 27 days is
asked
Dec 30, 2017
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
1994
im&or
pert&cpm
0
votes
0
answers
This spanning tree will contain.
asked
Dec 30, 2017
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
1994
im&or
pert&cpm
0
votes
0
answers
The probability that the project will be completed in 20 days is
asked
Dec 30, 2017
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
1993
im&or
pert&cpm
0
votes
0
answers
Which one of the following networks is correctly drawn?
asked
Dec 30, 2017
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
1993
im&or
pert&cpm
0
votes
0
answers
Consider an activity having a duration time of Tij. E is the earliest occurrence time and L the latest occurrence time
asked
Dec 30, 2017
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
1993
im&or
pert&cpm
0
votes
0
answers
Earliest finish time can be regarded as
asked
Dec 30, 2017
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
1993
im&or
pert&cpm
0
votes
0
answers
Show the critical path and calculate the project duration time.
asked
Nov 9, 2017
in
im&or
by
chandu
(
215k
points)
ies-conventional-2
2014
im&or
industrial-engg
pert&cpm
0
votes
0
answers
List the steps involved in numbering events and activities in a project so that CPM/PERT can be used for scheduling it.
asked
Nov 9, 2017
in
im&or
by
chandu
(
215k
points)
ies-conventional-2
2011
im&or
industrial-engg
pert&cpm
0
votes
0
answers
What is float or slack and when does a sub critical path becomes critical?
asked
Nov 9, 2017
in
im&or
by
chandu
(
215k
points)
ies-conventional-2
2010
im&or
industrial-engg
pert&cpm
0
votes
0
answers
Determine the total & free slacks of all the jobs.
asked
Nov 9, 2017
in
im&or
by
chandu
(
215k
points)
ies-conventional-2
2008
im&or
industrial-engg
pert&cpm
0
votes
0
answers
Find the three floats of the activity i-j.
asked
Nov 9, 2017
in
im&or
by
chandu
(
215k
points)
ies-conventional-2
2007
im&or
industrial-engg
pert&cpm
0
votes
0
answers
What is critical path? Why is the critical path of such importance in large project scheduling and control?
asked
Nov 9, 2017
in
im&or
by
chandu
(
215k
points)
ies-conventional-2
2006
im&or
industrial-engg
pert&cpm
0
votes
0
answers
From the three time estimates obtain the expected times of all the activities and slacks of all the events
asked
Nov 9, 2017
in
im&or
by
chandu
(
215k
points)
ies-conventional-2
2005
im&or
industrial-engg
pert&cpm
0
votes
0
answers
What is the distribution followed by the activity durations of a PERT network?
asked
Nov 9, 2017
in
im&or
by
chandu
(
215k
points)
ies-conventional-2
2004
im&or
industrial-engg
pert&cpm
0
votes
0
answers
With reference to critical path method define the following terms with a brief description of each of them
asked
Nov 9, 2017
in
im&or
by
chandu
(
215k
points)
ies-conventional-2
2003
im&or
industrial-engg
pert&cpm
Page:
« prev
1
2
3
4
5
6
next »
Ask a question:
Welcome to Q&A discussion forum, where you can ask questions and receive answers from other members of the community.
Categories
All categories
GATE
(2k)
IES Objectives-1
(1.8k)
IES Objectives-2
(2.8k)
IES Conventional-1
(655)
IES Conventional-2
(1.1k)
IAS Mains
(633)
IAS Prelims
(1.2k)
IES GS & Aptitude
(61)
Engineering Mathematics
(1)
Most popular tags
ies-objectives-2
gate
ies-objectives-1
production
iasprelims
ies-conventional-2
im&or
tom
fm
td
som
ies-conventional-1
iasmains
md
ppe
2009
2008
2014
2007
2005
10.4k
questions
274
answers
26
comments
15.3k
users
...