Match List – I (Topic) with List – II (Method of solving and select the correct answer using the codes given below the lists
List – I
(A) Forecasting
(B) Linear programming
(C) Wage incenti ve
(D) Work measurement
List – II
1. North – West corner method
2. Rowan plan
3. Method of penalty
4. Time series analysis
5. Work factor system
Codes:
A B C D
(a) 4 3 1 5
(b) 4 1 5 3
(c) 4 3 2 5
(d) 3 1 2 4