Based on the given graph, the economic range of batch sizes to be preferred for general purpose machine (GP). NC machine (NC) and special purpose (SP) will be:
Codes:
GP NC SP
(a) 2 5 4
(b) 1 4 5
(c) 3 2 4
(d) 1 4 2
10.4k questions
274 answers
26 comments
15.3k users