 Assertion (A): In a mould, a riser is designed and placed so that the riser will solidify after the casting has solidified

         Reason (R): A riser can acts as reservoir of molten metal which will supply molten metal where a shrinkage cavity would have occurred                                    

Please log in or register to answer this question.