Determine the optimum speed for achieving maximum production rate in a machining operation. The data is as follows:
Machining time/job = 6 min
Tool life = 90 min
Taylor’s equation constants C = 100, n = 0.5\job handling time = 4 min./job
Tool changing time = 9 min