Consider the following basic steps involved in the production of porous bearings:
1. Sintering 2. Mixing
3. Repressing 4. Impregnation
5. Cold – die compacting
Which one of the following is the correct sequence of the above steps?
(a) 1 – 2 – 3 – 4 – 5 (b) 2 – 5 – 1 – 3 – 4
(c) 5 – 4 – 3 – 2 – 1 (d) 4 – 3 – 1 – 5 – 2