In the expression of average production cost per component which of the following costs are

dependent on the cutting speed?                     

1. Machining cost        2. Tool changing cost              3. Tool cost

            Select the correct answer from the code given below

            (a) 1, 2 and 3               (b) 1 and 2       (c) 2 and 3       (d) 1 and 3