A 7MW hydro turbine working under a head of 10 m at a rotational speed of 125 rpm is to be designed and developed by conducting model tests in a laboratory. Maximum possible discharge to the model is 600 liters per second at a constant head of 5m. Determine the minimum scale of the model and its speed if the expected efficiency of the model is 85%.