0 votes
59 views
asked in fm&turbo by (215k points)

At a Hydro-electric power plant site, available head and flow rate are 24.5 m and 10.1m3/s respectively. If the turbine to be installed is required to run at 4.0 revolution per second (rps) with an overall efficiency of 90%, then suitable type of turbine for this site is                                                                                       

      (a) Francis                                                           (b) Kaplan

      (c) Pelton                                                            (d) Propeller

Please log in or register to answer this question.

Welcome to Q&A discussion forum, where you can ask questions and receive answers from other members of the community.