The product structure of an assembly P is shown in the figure.

Estimated demand for end product P is as follows

week

  1.  

  2

   3

    4

    5

     6

Demand

 1000

  1000

 100

  1000

  1200

   1200

Ignore lead times for assembly and sub assembly. Production capacity (per week) for component R is the bottleneck operation. Starting with zero inventory, the smallest capacity that will ensure a feasible production plan up to week 6 is           

                           (a) 1000           (b) 1200           (c) 2200                       (d) 2400