Production flow analysis (PFA) is a method of identifying part families that uses data from
0
votes
132
views
asked
Sep 8, 2017
in
IM&OR
by
chandu
(
215k
points)
Production flow analysis (PFA) is a method of identifying part families that uses data from
(a) engineering drawings
(b) production schedule
(c) bill of materials
(d) route sheets
gate
2001
im&or
production-planning
Please
log in
or
register
to add a comment.
Please
log in
or
register
to answer this question.
Related questions
0
votes
0
answers
If the production is carried out at 80 % of the rated capacity, then the monthly profit (in Rs) is _____________
asked
Sep 8, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2015
im&or
production-planning
0
votes
0
answers
For minimum cost of plan, the level of planned production in overtime in the third month is
asked
Sep 8, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2007
im&or
production-planning
0
votes
0
answers
Compute the cost of the production plan.
asked
Sep 8, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2000
im&or
production-planning
0
votes
0
answers
The most economical process for producing a batch of 100 pieces is
asked
Sep 8, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
2014
im&or
production-planning
0
votes
0
answers
The total number of possible layouts is
asked
Sep 8, 2017
in
IM&OR
by
chandu
(
215k
points)
gate
1995
im&or
production-planning
Welcome to Q&A discussion forum, where you can ask questions and receive answers from other members of the community.
Categories
All categories
GATE
(2k)
production
(409)
IM&OR
(175)
SOM
(145)
TOM
(164)
Engg Mechanics
(75)
Material Science
(53)
fm&turbo
(196)
HT
(152)
TD
(342)
MD
(111)
Engg-aptitude
(214)
IES Objectives-1
(1.8k)
IES Objectives-2
(2.8k)
IES Conventional-1
(655)
IES Conventional-2
(1.1k)
IAS Mains
(633)
IAS Prelims
(1.2k)
IES GS & Aptitude
(61)
Engineering Mathematics
(1)
Most popular tags
ies-objectives-2
gate
ies-objectives-1
production
iasprelims
ies-conventional-2
im&or
tom
fm
td
som
ies-conventional-1
iasmains
md
ppe
2009
2008
2014
2007
2005
10.4k
questions
274
answers
26
comments
15.3k
users
...