Login
Remember
Register
Adapala's Forum
Home
Questions
Unanswered
Tags
Categories
Users
Ask a Question
Adapala
IES GS
Ask a Question
Recent questions in IM&OR
0
votes
0
answers
Consider the following steps in a line balancing problem:
asked
Oct 13, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
Consider the following steps in a line balancing problem:
asked
Oct 13, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
Consider the following statements in respect of operations planning:
asked
Oct 13, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
Kilbridge and Wester method is used for which one of the following problems in a manufacturing unit?
asked
Oct 11, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
Break – even analysis can be used for which of the following?
asked
Oct 11, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
cost-accounting-and-control
0
votes
0
answers
What is the factory overhead charge?
asked
Oct 11, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
cost-accounting-and-control
0
votes
0
answers
What is the manufacturing lead time?
asked
Oct 11, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
inventory-control
0
votes
0
answers
Process layout is typical in job shops and batch production
asked
Oct 11, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
plant-layout
0
votes
0
answers
Consider the following statements
asked
Oct 11, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2008
im&or
production-planning
0
votes
0
answers
Match List – I with List – II
asked
Oct 9, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2007
im&or
transportation
0
votes
0
answers
The procedure involves movement from place to place, called?
asked
Oct 9, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2007
im&or
material-applications
0
votes
0
answers
Method study is carried out to achieve
asked
Oct 9, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2007
im&or
metal-forming
0
votes
0
answers
In trouble – shooting brain – storming session
asked
Oct 9, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2007
im&or
material-applications
0
votes
0
answers
Which of the following are the objectives of scheduling?
asked
Oct 9, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2007
im&or
scheduling
0
votes
0
answers
In a low volume production, the dispatching function is not concerned with issuing of which one of the following?
asked
Oct 9, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2007
im&or
inventory-control
0
votes
0
answers
In case of mutually exclusive projects, which one is the most suitable criterion for evaluation of projects?
asked
Oct 9, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2007
inventory-control
0
votes
0
answers
Match List – I with List – II and select the correct answer using the code given below the Lists:
asked
Oct 9, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2007
im&or
plant-layout
0
votes
0
answers
Match List – I with List – II and select the correct answer using the code given below the lists:
asked
Oct 9, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2007
im&or
scheduling
0
votes
0
answers
For a manual operation to study the total processing standard time using a chronometer
asked
Oct 9, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2007
im&or
inventory-control
0
votes
0
answers
The accuracy of time estimates in work sampling depends upon
asked
Oct 9, 2017
in
IM&OR
by
chandu
(
215k
points)
iasprelims
2006
im&or
inventory-control
Page:
« prev
1
2
3
4
5
6
...
8
next »
Ask a question:
Welcome to Q&A discussion forum, where you can ask questions and receive answers from other members of the community.
Categories
All categories
GATE
(2k)
IES Objectives-1
(1.8k)
IES Objectives-2
(2.8k)
IES Conventional-1
(655)
IES Conventional-2
(1.1k)
IAS Mains
(633)
IAS Prelims
(1.2k)
production
(189)
IM&OR
(147)
FM&Compressible
(170)
HT
(6)
TD
(113)
power-plant
(130)
IC-engines
(12)
RAC
(110)
SOM&MD
(140)
TOM
(147)
Engg-mechanics
(58)
Material Science
(23)
IES GS & Aptitude
(61)
Engineering Mathematics
(1)
Most popular tags
ies-objectives-2
gate
ies-objectives-1
production
iasprelims
ies-conventional-2
im&or
tom
fm
td
som
ies-conventional-1
iasmains
md
ppe
2009
2008
2014
2007
2005
Recent questions in IM&OR
10.4k
questions
274
answers
26
comments
14.6k
users
...