 Match List I with List II and select the correct answer using the code given below the Lists:                             

List I

(A) Transportation Problem

(B) Assignment Problem

(C) Dynamic Problem

(D) PERT

List II

1. Critical Path

2. Stage Coach

3. Vogel’s Approximate Method

4. Hungarian Method

Codes:

    A        B         C         D

(a) 2        1          3          4

(b) 3        4          2          1

(c) 2        4          3          1

(d) 3        1          2          4      