Consider the following statements:

1.   Preparation of master production schedule is an iterative process         

2.   Schedule charts are made with .respect  to jobs while load charts are made with     respect to machines

3.   MRP is done before master production    scheduling                

Which of the statements given above are     correct?

(a) 1, 2 and 3                  (b) 1 and 2

(c) 2 and 3                      (d) 1 and 3

Please log in or register to answer this question.