Match List – I (Methods) with List – II (Problems) and select the correct answer using the codes given  below the lists:

            List – I                           

(a) Moving average

(b) Line balancing

(c) Economic batch size

(d) Johnson algorithm

            List – II

1. Assembly                    2. Purchase

3. Forecasting                 4. Sequencing

Codes:

     A        B         C         D

(a) 1        3          2          4

(b) 1        3          4          2

(c) 3        1          4          2

(d) 3        1          2          4      