The assembly line for small tricycles has the following work elements identified and the sequence indicated.

For the above:

  1. prepare the precedence diagram.
  2. Using Helgeson and Bimic or any other heuristic method, show a feasible grouping of the work elements and number of workstations, assuming that the cycle time of one assembly is 8 minutes.
  3. Calculate the balance-delay for your arrangement