In a hydroelectric station, water is available at the rate of 175m3/s under a head of 18m. The turbines run at a speed of 150 rpm with overall efficiency of 82%. Find the number of turbines required if they have the maximum specific speed of 460.
10.4k questions
274 answers
26 comments
14.6k users