Login
Remember
Register
Adapala's Forum
Home
Questions
Unanswered
Tags
Categories
Users
Ask a Question
Adapala
IES GS
No answer
No selected answer
No upvoted answer
Ask a Question
Recent questions without a selected answer
0
votes
0
answers
Index register in a microprocessor is used for
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2014
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
The addressing mode used in the instruction PUSH B is
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2014
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
The time for which a piece of equipment operates is called
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2014
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Preparing a magnetic disk for data storage is called
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2014
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
A micro programmed control unit
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2014
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Materials requirement planning is driven by
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2014
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
The correct sequence of increasing production volume is
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2014
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Bucket is a term used in MRP system. It is a:
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2013
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Low level code is used for record processing of items in
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2012
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
A two–machine n–job sequencing problem with all jobs having same machine sequence is
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2012
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
The type of schedule inherent in the material requirements planning (MRP) procedure is
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2012
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
The under capacity of a manufacturing company is preferred when
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2011
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
In project scheduling, networks have an advantage over Gantt charts since network
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2010
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Consider the following statements: MRP constitutes a set of techniques that use
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2010
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
The flexible manufacturing system has
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2010
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
The following information is added in updating the inventory status file in MRP:
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2010
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
The lead time in material requirements planning is the time between:
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2010
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Assembly line balancing increases
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2009
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Which of the above are the inputs to MRP systems?
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2009
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
The MRP inventory status file contains
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
objectives-2
2009
im&or
scheduling&line-balancing-product-development&mrp
Page:
« prev
1
...
97
98
99
100
101
102
103
104
105
...
520
next »
Ask a question:
Welcome to Q&A discussion forum, where you can ask questions and receive answers from other members of the community.
Categories
All categories
GATE
(2k)
IES Objectives-1
(1.8k)
IES Objectives-2
(2.8k)
IES Conventional-1
(655)
IES Conventional-2
(1.1k)
IAS Mains
(633)
IAS Prelims
(1.2k)
IES GS & Aptitude
(61)
Engineering Mathematics
(1)
Most popular tags
ies-objectives-2
gate
ies-objectives-1
production
iasprelims
ies-conventional-2
im&or
tom
fm
td
som
ies-conventional-1
iasmains
md
ppe
2009
2008
2014
2007
2005
10.4k
questions
274
answers
26
comments
15.3k
users
...