Login
Remember
Register
Adapala's Forum
Home
Questions
Unanswered
Tags
Categories
Users
Ask a Question
Adapala
IES GS
Ask a Question
Recent questions tagged 2001
0
votes
0
answers
Match List – I (charts) with List – II (Operations/informations)
asked
Jan 8, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
work-study&work-measurement
0
votes
0
answers
The slope of cantilever at the free end is
asked
Jan 8, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2001
som
deflection-of-beams
0
votes
0
answers
The resulting deflection of spring is nearly
asked
Jan 8, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2001
som
strain-energy&thermal-stresses
0
votes
0
answers
The ratio of $\frac{P_{2}}{P_{1}}$ is
asked
Jan 7, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2001
som
eulers-theory-of-column
0
votes
0
answers
the eccentricity ‘e’ should be less than or equal to
asked
Jan 7, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2001
som
eulers-theory-of-column
0
votes
0
answers
The ratio $\frac{M_{t1}}{M_{t2}}$ is
asked
Jan 7, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2001
som
torsion-of-shafts
0
votes
0
answers
the maximum power transmitted by B is
asked
Jan 7, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2001
som
torsion-of-shafts
0
votes
0
answers
Dispatching function of Production planning and control is
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Number of welding lines required is
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
In production planning and control the document which authorizes the strat of an operation on the shop floor is the
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
During manufacture of cement the handling of limestone s done by
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Match List – I (OR – technique) with List – II (Model)
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
Which one of the following combinations is valid for product layout?
asked
Jan 6, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
scheduling&line-balancing-product-development&mrp
0
votes
0
answers
In Dodge Rooming sampling tables the screening inspection of rejected lots is
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
value-engg
0
votes
0
answers
Control chart for variables provides the
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
value-engg
0
votes
0
answers
(A) OC curve (B) AOQL (C) Binomial distribution
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2001
im&or
value-engg
0
votes
0
answers
The stress at point Q in the web (very close to the flange) is
asked
Jan 5, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2001
som
bending&shearstressdistribution-inbeams
0
votes
0
answers
The resultant bending moment at the mid – span shall be zero if a/b is
asked
Jan 5, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2001
som
sfd&bmd
0
votes
0
answers
The shear force distribution in the beam is represented by
asked
Jan 5, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2001
som
sfd&bmd
0
votes
0
answers
The ratio of circumferential strain to axial strain is
asked
Jan 4, 2018
in
som
by
chandu
(
215k
points)
ies-objectives-2
2001
som
thin-thick-cylinders
Page:
« prev
1
2
3
4
5
6
7
8
9
...
21
next »
Ask a question:
Welcome to Q&A discussion forum, where you can ask questions and receive answers from other members of the community.
Categories
All categories
GATE
(2k)
IES Objectives-1
(1.8k)
IES Objectives-2
(2.8k)
IES Conventional-1
(655)
IES Conventional-2
(1.1k)
IAS Mains
(633)
IAS Prelims
(1.2k)
IES GS & Aptitude
(61)
Engineering Mathematics
(1)
Most popular tags
ies-objectives-2
gate
ies-objectives-1
production
iasprelims
ies-conventional-2
im&or
tom
fm
td
som
ies-conventional-1
iasmains
md
ppe
2009
2008
2014
2007
2005
10.4k
questions
274
answers
26
comments
15.3k
users
...