Login
Remember
Register
Adapala's Forum
Home
Questions
Unanswered
Tags
Categories
Users
Ask a Question
Adapala
IES GS
Ask a Question
Recent questions in IES Objectives-2
0
votes
0
answers
Value engineering is necessary to be used when following symptoms are indicated:
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2010
im&or
value-engg
0
votes
0
answers
Which one of the following statements is not correct for the TQC?
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2010
im&or
value-engg
0
votes
0
answers
Which of the above refer to value engineering?
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2009
im&or
value-engg
0
votes
0
answers
An Operating Characteristic Curve (OC curve) is a plot between
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2009
im&or
value-engg
0
votes
0
answers
If in a process on the shop floor the specifications are not met but the charts for
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2009
im&or
value-engg
0
votes
0
answers
The averages of sub-groups of readings are plotted instead of plotting individual readings.
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2008
im&or
value-engg
0
votes
0
answers
In case of Control Chart for fraction rejected (p-chart), binomial distribution is
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2008
im&or
value-engg
0
votes
0
answers
Value Engineering is concerned with increasing the quality of the
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2008
im&or
value-engg
0
votes
0
answers
The operating characteristic curve of
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2008
im&or
value-engg
0
votes
0
answers
Which one of the following is not the characteristic of acceptance sampling?
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2006
im&or
value-engg
0
votes
0
answers
The objective of value analysis is :
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2006
im&or
value-engg
0
votes
0
answers
Value analysis is superior to other
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2005
im&or
value-engg
0
votes
0
answers
In attribute control of quality by sampling, the sample size has to be
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2005
im&or
value-engg
0
votes
0
answers
What is the likelihood of a sample mean falling outside the control limits?
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2005
im&or
value-engg
0
votes
0
answers
Match List I (Activity) with List II (Technique)
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2005
im&or
value-engg
0
votes
0
answers
Consider the following statements with respect to control charts for attributes
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2004
im&or
value-engg
0
votes
0
answers
What should be the setting of the process to ensure production of no scrap and to minimize the rework?
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2004
im&or
value-engg
0
votes
0
answers
Match List I (Quality control concepts) with List II (Quality control techniques)
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2004
im&or
value-engg
0
votes
0
answers
In case of friction clutches
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2003
im&or
value-engg
0
votes
0
answers
Consider the following statements in respect of double sampling plan:
asked
Jan 5, 2018
in
im&or
by
chandu
(
215k
points)
ies-objectives-2
2003
im&or
value-engg
Page:
« prev
1
...
17
18
19
20
21
22
23
24
25
...
142
next »
Ask a question:
Welcome to Q&A discussion forum, where you can ask questions and receive answers from other members of the community.
Categories
All categories
GATE
(2k)
IES Objectives-1
(1.8k)
IES Objectives-2
(2.8k)
tom
(488)
md
(417)
som
(393)
material science
(345)
production
(703)
im&or
(472)
robotics
(1)
mechatronics
(4)
engg mechanics
(5)
IES Conventional-1
(655)
IES Conventional-2
(1.1k)
IAS Mains
(633)
IAS Prelims
(1.2k)
IES GS & Aptitude
(61)
Engineering Mathematics
(1)
Most popular tags
ies-objectives-2
gate
ies-objectives-1
production
iasprelims
ies-conventional-2
im&or
tom
fm
td
som
ies-conventional-1
iasmains
md
ppe
2009
2008
2014
2007
2005
Recent questions in IES Objectives-2
10.4k
questions
274
answers
26
comments
15.3k
users
...